b'PLANNING AND STUDIESTRANSMISSION PLANNING FOR LARGE INVESTOR-OWNED UTILITY|COLORADOUlteig supports a large investor-owned utility performing studies for their transmission planning department. Ulteigs scope of work includes generator interconnection studies for proposed renewable projects to the system and other transmission studies. Study details include evaluation of various system impacts such as voltage range violations, higher-queued generation, and existing generator settings. Studies performed include load flow, contingency, and/or stability analysis depending on the studied facility. A report is prepared providing recommendations for the proposed generator as well as necessary upgrades or system modifications.17'