This rural town in north-central Minnesota was overdue for several infrastructure repairs, including reconstruction of a one-mile stretch of highway into a segment of city street with a multipurpose trail and sidewalk. Glyndon’s 50-year-old cast-iron wastewater collection piping was also in need of replacement.
Ulteig was selected by the Clay County Highway Department and
City of Glyndon to complete design and construction for this entire
project. During 2017, work began with taking the main arterial rural
section of roadway and converting it to an urban section by widening and
lowering it, adding a curb and gutter system, and incorporating a
sidewalk on one side and a bike path on the other. Utilities beneath the
roadway had to be lowered and regraded since they did not meet cover
requirements.
The water distribution system within the reconstruction area
also required replacement to ensure sufficient storm water drainage.
When this major renovation is completed in 2018, it will
dramatically improve pedestrian safety and traffic flow through town,
making Glyndon a more appealing prospect for potential new businesses
and homeowners.