Ulteig is leading the preliminary design and environmental clearance for a new interchange along I-29 in southern Grand…
Region Archives:
Cheyenne Ridge Wind
Located in Colorado’s Cheyenne and Kit Carson counties, the Cheyenne Ridge Wind project began in June 2019. The…
Buena Vista County – Funding, Road, and Safety Project
Buena Vista County, Iowa The Iowa Department of Transportation partnered with Buena Vista County, the regional planning authority,…
Monarch Boulevard
Ulteig’s Civil team, including Luke Arnold, PE, Senior Engineer and Paul Moreau, PE, Senior Engineer, have taken on…
Bakerville Highway Design
Clear Creek County, Colorado – The Colorado Department of Transportation (CDOT) has selected Ulteig as a design engineering…
U.S. 52 Passing Lanes
Carrington, North Dakota – Heavy-duty truck traffic and agriculture equipment traffic has increased along U.S. 52, and the…
I-76/CO 52 Roundabout Intersection
Denver, Colorado – In the small town of Hudson near Denver, CO, where I-76 intersects with CO 52,…
Walker North Side Water Project
Walker, Minnesota – Walker’s Leech Lake is a world-class fishing destination known for its incredible walleye population and…
Heart River Bridge Rehabilitation Project
Repairing Deteriorating Bridge Pier on an Aging Bridge in North Dakota Dickinson, North Dakota – The Heart River…
Crowned Ridge Wind Project
Crowned Ridge Wind Project In 2017, planning and design began on a 600-megawatt wind farm project in northeastern…
Hamburg Iowa Flood Project
Hamburg, Iowa — A small town in Iowa where 2 rivers converge, was hit by flooding and then…
Highway 1804
Ulteig Exceeds Expectations in Renovating Historic Lewis & Clark Expedition Route in North Dakota Williston, North Dakota —…
Gary Water Tower and Plant
Living along the eastern edge of the Great Plains, among neighboring corn and soybean fields, Gary, Minnesota’s 214…
Fall River Road
Ulteig was hired by Colorado Department of Transportation (CDOT) to complete the design of the Fall River Road…
Oakport Flood Mitigation
Oakport Township, now part of the city of Moorhead, Minn., is situated along the Red River and the…
Newport Substation Interconnect
Among the cornfields in southeastern Iowa, near the small town of Wapello, where the Iowa and Mississippi Rivers…
Veteran’s Boulevard Substation and T-Line Upgrade
Minnkota Power Cooperative (MPC) partnered with Ulteig to design its new 115/25 kV substation and associated transmission line…
CDOT I-70 F13-S Bridge Replacement
It’s a stretch of road you’ll never forget. At slightly more than nine miles in length and rising…
Breckenridge Water Treatment Plant Redesign
The headwaters of the Red River of the North are found where the Otter Tail River and the…
US Highway 2 Westbound Concrete Overlay
This project consisted of several elements. Urban Section: Three-inch Minor Rehabilitation HBP Overlay The urban section consisted of…
Douglas Trail Substation
When Epic Systems Corporation approached the city of Rochester, Minnesota, to request a substation on an aggressive deadline,…
Rest Area Waste Pretreatment System
Ulteig designed a first-of-its-kind pretreatment system for waste generated at a rest area along I-94 managed by the…
Buffalo Ridge II Wind Farm
Ulteig provided right-of-way services for this project. Leases were obtained for placement of wind turbines, access roads, transformers, splice…
City of Henning GIS Services
The survey consisted of collecting approximately 700 features, including curb stops, valves, hydrants, and sanitary sewer manholes. The…
Buchanan Substation and Tap Line
Ulteig’s support of a new distribution substation site and 43.8 kV transmission tap line in Buchanan, Stutsman County,…
Williston Basin International Airport
Planning for the new $273 million Williston Basin International Airport (XWA) began in 2012. Ulteig started working with…
Medora Interstate Reconstruction
Overseen by the North Dakota Department of Transportation (NDDOT), this project involved the complete replacement of the Interstate…
Midtown Substation
The project was needed to meet local electrical demand and is unique in that a Gas Insulated Switchgear…
City of Walker Infrastructure
Ulteig provided design engineering services for the infrastructure in the city of Walker, Minnesota. This included 20 city…
Redlands Parkway Roundabout
The SH 340 & Redlands Pkwy Roundabout project was created to improve the safety of the SH 340…
Rose Creek/Drain 27 Flood Mitigation Project
The original scope of the preliminary design required determining the most efficient option for a flood-risk reduction project…
22.5MW Battery Energy Storage System
To accommodate a new 22.5 MW Battery Energy Storage System at a large wind energy center, an additional…
Cross Winds Energy Park
The collection system design involved optimizing the route so as to provide the best possible option for both…
Beebe 1B Wind Farm
The substation design presented a unique challenge as the addition to the low side had separate power purchasers,…
Western Wind
In 2016, Infinity contracted with Ulteig to provide construction monitoring services for the $450 million (approx.), 280 MW, Western Plains…
City of Arvada
Ulteig is currently serving as the City of Arvada’s Owner’s Rep for the W 72nd Avenue Bond project….
Glyndon Water and Sewage Improvements
This rural town in north-central Minnesota was overdue for several infrastructure repairs, including reconstruction of a one-mile stretch of…
MBPP East 345KV Transmission Loop
These projects carried very aggressive timelines and required design work commence as soon as possible. Engineering design included…
Northstar Transloading
A multi-commodity inbound/outbound railroad and trucking transload terminal owned and operated by NorthStar Transloading (NST) serving the Bakken…
Colorado DOT Wildlife Fence
Ulteig is providing construction engineering services for the I-70 Wildlife Fence Project located in Eagle County, Colorado. This…